Recently Completed Projects
M2 Upgrade - Vimiera Rd Stablisation Project
Construction of bases, heavy retaining walls, a sewer riser, dissipator structure, barriers, drainage and associated works adjacent to the live motorway on a difficult site.
- Design, supply and installation of formwork to walls over 6m high and 4.2m wide, with concrete pressures over 120KPa.
- Design, supply and install all scaffold.
- Pump and place 2500m3+ concrete.
- Design, supply and operate a 32m tower placement boom, concrete pumped via 250m of line from M2 carriageway.
Brooklyn Sewerage Treatment Plant
As part of the Sydney Water Priority Sewerage Scheme, a new sewerage treatment plant was built at Brooklyn including contruction of
- Large Multi chamber Biorector
- Chemical Dosing Unit
- First Flush Tank
- Building and ammenities slabs and first fix fit out to buildings
- External ground slabs
- All water retaining structures Hydrostatically tested and passed leak free first test.
M2 Upgrade Project, Christie Road Bridge
As a part of the M2 Upgrade project with Leighton Contractors, Timbermass Constructions was awarded the contract to both lengthen and widen the the Christie Road overbridge.
This involved
- extension of the existing central median crash barrier and headstock.
- Extisting abutment extension and new abutment construction.
- Two post tensioned diaphrams to the existing superstructure to lengthen bridge span and accomodate the additional west bound M2 lane.
- All works carried out and completed under live traffic conditions from start to finish.